Gillespie, IL
Scope: 12 miles of 8 inch anhydrous ammonia line Duration: Sept-Dec 2019 Gillespie, IL Value: $6.9 Million
Live Oak, FL
Scope: Fabrication and Installation of Regulator Station in Live Oak Florida Duration: April-July 2014 Value: $1.7 Million
Norcross, GA
Scope: Installation of AGL Norcross Launcher and Receiver and ILI Retrofits Duration: Aug 2016-April 2017 Value: $1.3 Million
Macon, GA
Scope: Macon Milledgeville ILI Retrofits, ILI Reroute, and Pigging Assistance. Duration: April 2017 to present Value: $20 Million Description: Made 36 miles of 12”steel piggable including a 3.5 mile relay with various HDD’s and built two launcher/receiver sites. Once line was fully piggable we assisted AGL running smart pigs and repairing immediate conditions as a result of pig runs. Rebuilt two regulator stations as part of ILI scope
Duluth, GA
Scope: 10 miles of 8” and 12” in-street by excavation and Horizontal Directional Drilling Location: Duluth, GA Duration: January-October 2015 Value: $18 Million